Projects
Notting Hill
Situation
Mid-terrace house converted into flats.
Contract Sum
In the region of £8,000.00 – £12,000.00
Contract Duration
The original contract duration was 3 weeks, BNS Building Services delivered the project within the contract duration.
Summary of the Works Undertaken
Our client instructed BNS Building Services to demolish a distorted boundary wall to the rear garden and re-build the wall to same height. Due to the property being of a mid-terrace construction, we instructed a scaffolding company to provide an up and over scaffolding, to allow for all materials to be safely transported to the rear garden. The wall was safely demolished and re-built with a weather struck pointing finish.






Notting Hill
Situation
End of terrace house converted into flats.
Contract Sum
In the region of £40,000.00 – £55,000.00
Summary of the Works Undertaken
The repair and redecoration of the front and rear elevations.
Chelsea
Situation
Mid – terrace house converted into flats.
Contract Sum
In the region of £20,000.00 – £30,000.00
Summary of the Works Undertaken
The repair and redecoration of the front elevation.




Notting Hill
Situation
Mid – terrace house converted into flats.
Contract Sum
In the region of £45,000.00 – £65,000.00
Summary of the Works Undertaken
The repair and redecoration of the front elevation and the liquid overlay of the main roof.
Richmond
Situation
Detached purpose-built block of flats.
Contract Sum
In the region of £9,000.00-£16,000.00
Summary of the Works Undertaken
The client has instructed BNS Building Services to demolish a distorted rear boundary and re-build the wall to a safe height specified by the structural engineer.








Wimbledon
Situation
Detached house converted into flats.
Contract Sum
In the region of £65,000.00-£75,000.00
Summary of the Works Undertaken
The repair and redecoration of the front elevation and the liquid overlay of the main roof.
Hyde Park
Situation
Terraced house converted into flats.
Contract Sum
In the region of £50,000.00-80,000.00.
Summary of the Works Undertaken
The repair and redecoration to front and rear elevations.













Twickenham
Situation
Mid terraced house.
Contract Sum
In the region of £45,000.00-£75,000.00.
Summary of the Works Undertaken
Back extension, new kitchen , flooring and new pavement and garden works.
Dawson Place
Situation
Terraced house converted into flats.
Contract Sum
In the region of £40,000.00-75,000.00.
Summary of the Works Undertaken
The repair and redecoration of the front and rear elevations and left and right flanks.
Liquid overlay of main roof.














Kensington
Situation
Terraced house converted into flats.
Contract Sum
In the region of £40,000.00-£70,000.00.
Summary of the Works Undertaken
The repair and redecoration to front and rear elevations and Roof replacement.