Projects

Notting Hill

Situation

Mid-terrace house converted into flats.

Contract Sum

In the region of £8,000.00 – £12,000.00

Contract Duration

The original contract duration was 3 weeks, BNS Building Services delivered the project within the contract duration.

Summary of the Works Undertaken

Our client instructed BNS Building Services to demolish a distorted boundary wall to the rear garden and re-build the wall to same height. Due to the property being of a mid-terrace construction, we instructed a scaffolding company to provide an up and over scaffolding, to allow for all materials to be safely transported to the rear garden. The wall was safely demolished and re-built with a weather struck pointing finish.

Notting Hill

Situation

End of terrace house converted into flats.

Contract Sum

In the region of £40,000.00 – £55,000.00

Summary of the Works Undertaken

The repair and redecoration of the front and rear elevations.

Chelsea

Situation

Mid – terrace house converted into flats.

Contract Sum

In the region of £20,000.00 – £30,000.00

Summary of the Works Undertaken

The repair and redecoration of the front elevation.

Notting Hill

Situation

Mid – terrace house converted into flats.

Contract Sum

In the region of £45,000.00 – £65,000.00

Summary of the Works Undertaken

The repair and redecoration of the front elevation and the liquid overlay of the main roof.

Richmond

Situation

Detached purpose-built block of flats.

Contract Sum

In the region of £9,000.00-£16,000.00

Summary of the Works Undertaken

The client has instructed BNS Building Services to demolish a distorted rear boundary and re-build the wall to a safe height specified by the structural engineer.

Wimbledon

Situation

Detached house converted into flats.

Contract Sum

In the region of £65,000.00-£75,000.00

Summary of the Works Undertaken

The repair and redecoration of the front elevation and the liquid overlay of the main roof.

Hyde Park

Situation

Terraced house converted into flats.

Contract Sum

In the region of £50,000.00-80,000.00.

Summary of the Works Undertaken

The repair and redecoration to front and rear  elevations.

Twickenham

Situation

Mid terraced house.

Contract Sum

In the region of £45,000.00-£75,000.00.

Summary of the Works Undertaken

Back extension, new kitchen , flooring and new pavement and garden works.

Dawson Place

Situation

Terraced house converted into flats.

Contract Sum

In the region of £40,000.00-75,000.00.

Summary of the Works Undertaken

The repair and redecoration of the front and rear elevations and left and right flanks.

Liquid overlay of main roof.

Kensington

Situation

Terraced house converted into flats.

Contract Sum

In the region of £40,000.00-£70,000.00.

Summary of the Works Undertaken

The repair and redecoration to front and rear elevations and Roof replacement.